Define the operating boundary
Agree on what can be controlled, when it can change and which loads take priority.
Site coordination
Coordinate compatible generation, storage and loads locally within the limits configured for the installation.

Agree on what can be controlled, when it can change and which loads take priority.
Use the available site capacity to coordinate charging while preserving the headroom required by other loads.